COMBINED INSTALLATION OF MASSUT VACUUM DISTILLATION AND VISBREAKING OF PM-3 TAR WITH COMMON FACILITIES
As part of this project, the “turnkey” work was carried out to introduce the process control system and computer training complex (CTC) at Afipsky Oil Refinery LLC in order to automate the enterprise management system, increase the efficiency of informing the on-site duty-dispatching services and train operational and technical personnel to control the Process Control System of the combined installation of residual oil vacuum distillation and visbreaking of tar PM-3 (CIROVD&VT PM-3) "Afipsky oil refinery".
Scope of work:
- Design, detailed design and operational documentation has been developed;
- application software has been developed and configured;
- commissioning was carried out and the facility was commissioned;
- Personnel has been trained to work with CTC CIROVD&VT PM-3
Orgneftekhim-Holding LLC
Orgneftekhim-Holding is the parent company of the group which ensures implementation of full-cycle projects in the field of oil refining and petrochemicals, from the development of a conceptual idea, design, construction, to the commissioning of the facility.
WE WORKED FOR
Krasnodar Territory, town of Afipsky, Afipsky Oil Refinery LLC